Factory Price 3d Wall Decor - Metal Christmas Tree Decoration with Jingle Bells for Table Top Décor Christmas Ornaments – DECOR Detail:
Specifications
• Galvanized sheet metal, hand-made.
• Available in a set of 3, or individual size.
• Large-27.75”H, Medium-22.25”H, Small 17.75”H
• Made of 100% iron.
Dimensions & Weight
Item No.: |
DZ20B0067 |
Overall Size: |
L- 8″W x 5.3″D x 27.75″H (20.4w x 13.5d x 70.5h cm) M-7.09″W x 4.5″D x 22.25″H (18w x 11.4d x 56.5h cm) S-5.9″W x 3.75″D x 17.75″H (15w x 9.5d x 45h cm) |
Product Weight |
4.19 Lbs (1.9 Kgs) |
Case Pack |
1 Set/3 |
Volume per Carton |
0.035 Cbm (1.23 Cu.ft) |
50 Sets – 100 Sets |
$23.50 |
101 Sets- 200 Sets |
$20.70 |
201 Sets – 500 Sets |
$19.20 |
501 Sets – 1000 Sets |
$17.90 |
1000 Sets < |
$16.90 |
Product Details
● Product Type: Ornament
● Material: Iron
● Frame Finish: Antique Pewter and Gold Highlight
● Assembly Required : No
● Hardware Included: No
● Care Instructions: Wipe clean with a damp cloth; do not use strong liquid cleaners
Product detail pictures:










Related Product Guide:
Which has a positive and progressive attitude to customer's desire, our corporation constantly improves our merchandise quality to satisfy the desires of consumers and further focuses on safety, reliability, environmental demands, and innovation of Factory Price 3d Wall Decor - Metal Christmas Tree Decoration with Jingle Bells for Table Top Décor Christmas Ornaments – DECOR, The product will supply to all over the world, such as: Saudi Arabia, Botswana, Buenos Aires, Till now, the goods list has been updated regularly and attracted clients from around the globe. Detailed facts is often obtained in our web-site and you'll be served with premium quality consultant service by our after-sale group. They are going to help you get comprehensive acknowledge about our products and make a satisfied negotiation. Company go to to our factory in Brazil is also welcome at any time. Hope to obtain your inquiries for any pleased co-operation.

This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
